Hyundai L&CBodaq® Certified Installer Network

Certified Bodaq Installers, Matched to the Job.

Certified installers across the United States and Canada. Send the job and a certified Bodaq installer is matched to the job type: doors, casework, full-height walls, elevator cabs. Not a general handyman.

Install Bodaq film? Get trained and certified

An installer heat-forming wood grain film onto a cabinet door
Bodaq installer network

Find an Installer

Certified Bodaq installers in most states and provinces across the US and Canada. Tell us about the job and we connect you with one.

Request an Installer
110+Certified installer listings
MostStates and provinces
450+Current Bodaq patterns
10 YearsWarranty on the film

01 Two Ways In

One Network, Both Sides of the Job

Clients find an installer: send the job and get matched with a certified installer for it. Installers train, certify and join the network.

For Clients

Need Bodaq Film Installed?

Certified installers across the United States and Canada. Send us the job and we connect you with the right installer.

For Installers

Install Bodaq Film?

Certified installers are eligible for project referrals from Bodaq and are presented as trusted installers on our website.

02 Matched to the Job

The Installer Who Has Done This Surface Before

Most film projects fail between the people, not in the material: the wrong roll count, an installer who has never done an elevator, nobody owning the schedule.

Request an Installer

03 How a Project Runs

Five Steps from First Photo to Signed-Off Surface

The same sequence for a single reception desk or forty hotel corridors. What changes is the scale, not the process.

Multi-Site Projects
Gallery corridor · panels and reveals refinished in place
  1. Step 1Send the Scope

    Photos, dimensions, location, target date, and any pattern you have seen. A phone photo and a tape measure are enough to start.

  2. Step 2Estimate & Samples

    Square footage, roll count, install days and a price range, plus physical samples of the shortlisted patterns in the post.

  3. Step 3Confirm the Finish

    Pattern codes locked, fire test report supplied for the submittal, film ordered from stock or from the mill with a stated lead time.

  4. Step 4Installer Matched

    A certified installer with the right track record is booked for the dates. For phased or multi-site work, a project manager is assigned.

  5. Step 5Install & Sign-Off

    Substrate prepared, film applied, post-heated on returns, inspected against the scope. Care guidance and warranty documents handed over.

04 Where They Are

Certified Installers Across the US and Canada

Certified Bodaq installers work in most states and provinces. Tell us where the job is and we connect you with a certified installer for it.

To be connected with a representative in your city, email info@bodaq.com or call +1-929-249-9996.

Newly certified Bodaq installers holding their certificates

05 For Installers

Become a Certified Bodaq Installer

Certified installers are eligible for project referrals from Bodaq and are presented as trusted installers on our website.

  • In-Person ExamOne day. For installers with good knowledge and experience in vinyl film installation.
  • Location and PricingContact us and we will discuss your options.

06 Installation Videos

See How Bodaq Film Goes On

Watch the installation tutorial from the official Bodaq channel. More lessons, from cabinet doors to inside and outside corners, are on the training page.

07 FAQ

Common Questions

Installation, warranty and working with a certified installer.

Can I install Bodaq film myself?

For small projects or DIY applications, it's possible. However, for full room renovations or commercial projects, we strongly recommend hiring a Bodaq Certified Installer to ensure durability and warranty coverage.

Does Bodaq offer a warranty?

Yes. Bodaq offers a 10-year warranty on the film material.

Read the warranty terms (PDF)

How is Bodaq interior film installed?

Installation involves cleaning the surface, applying primer (if needed), and heat-stretching the film to wrap corners and edges smoothly. Certified installers use heat guns and squeegees for precision and bubble-free application.

Can I supply my own installer?

Yes. We will still scope the job and supply the film, and we can certify your installer on Bodaq if they have not worked with it. Warranty on the installation itself then sits with them rather than with us.

How long does an installation take?

An elevator cab is typically an overnight; a hotel guest-room joinery set is a day; a full-height corridor is measured in linear feet per crew-day. The estimate states install days per location, and multi-site work is sequenced so rooms return to service in order.

What surfaces can Bodaq film wrap?

Bodaq adheres well to a wide range of surfaces, such as wood and MDF, painted drywall, metal, glass, laminate and plastic.

Proper surface preparation is essential. Sanding and priming may be required for best adhesion.

08 The Film

Film Is Ordered on bodaq.com

Film is ordered on the official Bodaq® site, bodaq.com, by Hyundai L&C: 450+ current patterns, samples first. Bring the pattern codes to your installer, or add them to your request.

09 Start

Tell Us Where, What and When

Send the job and we connect you with a certified installer for it. Or call +1-929-249-9996 or email info@bodaq.com.